Short answer

Slab volume = length × width × thickness ÷ 27, in feet. A 24×24 ft garage slab at 6 inches thick: 24 × 24 × 0.5 ÷ 27 = 10.67 yards — order 11.5 with waste. Use 4 inches for patios and walkways, 5–6 inches for driveways and garages.

Thickness rules of thumb by slab use

Slab typeThicknessYards per 100 ft²
Sidewalk / patio4 in1.23 yd³
Residential driveway5–6 in1.54–1.85 yd³
Garage floor6 in1.85 yd³
RV / heavy vehicle pad6–8 in1.85–2.47 yd³

How to read this table

Context

Thickness is the decision that matters more than the exact volume: a 4-inch driveway that cracks under an SUV costs far more than the extra 0.6 yards per 100 ft² that 6 inches would have added. Reinforcement (rebar or wire mesh) and a compacted gravel base of 4 inches are standard for anything vehicle-bearing. Irregular shapes: split into rectangles, compute each, and add.

What moves this number

Regional pricing

Ready-mix, bag, and labor prices vary 30–50% between US metros. Sun Belt markets with many plants run well below Northeast and remote-area pricing.

Waste and site conditions

Uneven subgrade, spillage, and form bowing consume 5–15% extra material. Orders placed at exact volume routinely come up short mid-pour.

Local code requirements

Frost depth, footing dimensions, and reinforcement rules are set by county. The same project can require twice the concrete in a northern climate versus a southern one.

Methodology

Volume formula as in the cubic-yards answer; thickness guidance follows ACI 302 residential practice (4 in minimum for pedestrian slabs, 5–6 in for light vehicles). Yards per 100 ft² = thickness in feet × 100 ÷ 27.

Assumptions and caveats

Frequently asked questions

How do you calculate concrete for a slab?

Slab volume = length × width × thickness ÷ 27, in feet. A 24×24 ft garage slab at 6 inches thick: 24 × 24 × 0.5 ÷ 27 = 10.67 yards — order 11.5 with waste. Use 4 inches for patios and walkways, 5–6 inches for driveways and garages.

Which option pays the most in the thickness rules of thumb by slab use table?

RV / heavy vehicle pad, at 6–8 in (1.85–2.47 yd³). That row represents the strongest case in this dataset, so use it as an upper bound rather than an expectation.

What is a realistic low-end figure?

Sidewalk / patio at 4 in (1.23 yd³). Plan your costs so the low end still works, then treat anything above it as upside.

Why do the numbers vary so much?

The spread between the highest and lowest row is about 2.0×. Regional pricing and waste and site conditions explain most of that gap — see the drivers section above for the full list.

Where do these numbers come from?

Volume formula as in the cubic-yards answer; thickness guidance follows ACI 302 residential practice (4 in minimum for pedestrian slabs, 5–6 in for light vehicles). Yards per 100 ft² = thickness in feet × 100 ÷ 27.

How can I estimate my own number instead of using a benchmark?

Use the Concrete Slab Cost Calculator on RevenueLab — it takes your own inputs and returns a figure specific to your setup, which is always more accurate than a published range.

Model your own numbers

Related reading

More answers in this category

Looking for a calculator?

Search every free tool on RevenueLab — or describe your problem and Rex will pick one.

Last updated 2026-10-01.