How many bags of concrete make a cubic yard?

Short answer

One cubic yard takes 90 forty-pound bags, 60 sixty-pound bags, or 45 eighty-pound bags. An 80-lb bag yields about 0.60 cubic feet, and a yard is 27 cubic feet: 27 ÷ 0.60 = 45 bags.

Bags per cubic yard by bag size

Bag sizeYield per bagBags per yard
40 lb0.30 ft³90 bags
50 lb0.375 ft³72 bags
60 lb0.45 ft³60 bags
80 lb0.60 ft³45 bags
90 lb0.675 ft³40 bags

How to read this table

Context

Bagged mix makes sense up to about half a yard — beyond that, you're mixing 20+ bags by hand and paying a premium per yard. At 2026 prices (~$6–8 per 80-lb bag), a yard of bagged concrete runs $270–360 versus $150–190 for ready-mix delivered, before the short-load fee. The crossover is roughly 1–1.5 yards: below that bags win on convenience, above it call the plant.

What moves this number

Regional pricing

Ready-mix, bag, and labor prices vary 30–50% between US metros. Sun Belt markets with many plants run well below Northeast and remote-area pricing.

Waste and site conditions

Uneven subgrade, spillage, and form bowing consume 5–15% extra material. Orders placed at exact volume routinely come up short mid-pour.

Local code requirements

Frost depth, footing dimensions, and reinforcement rules are set by county. The same project can require twice the concrete in a northern climate versus a southern one.

Methodology

Yields are the manufacturer-published values for standard 4,000-psi bagged mixes (Quikrete/Sakrete class). Ready-mix pricing reflects 2026 US national average range of $150–190 per cubic yard before delivery and short-load fees.

Assumptions and caveats

Frequently asked questions

How many bags of concrete make a cubic yard?

One cubic yard takes 90 forty-pound bags, 60 sixty-pound bags, or 45 eighty-pound bags. An 80-lb bag yields about 0.60 cubic feet, and a yard is 27 cubic feet: 27 ÷ 0.60 = 45 bags.

Which option pays the most in the bags per cubic yard by bag size table?

90 lb, at 0.675 ft³ (40 bags). That row represents the strongest case in this dataset, so use it as an upper bound rather than an expectation.

What is a realistic low-end figure?

40 lb at 0.30 ft³ (90 bags). Plan your costs so the low end still works, then treat anything above it as upside.

Why do the numbers vary so much?

The spread between the highest and lowest row is about 2.3×. Regional pricing and waste and site conditions explain most of that gap — see the drivers section above for the full list.

Where do these numbers come from?

Yields are the manufacturer-published values for standard 4,000-psi bagged mixes (Quikrete/Sakrete class). Ready-mix pricing reflects 2026 US national average range of $150–190 per cubic yard before delivery and short-load fees.

How can I estimate my own number instead of using a benchmark?

Use the Concrete Cost Calculator on RevenueLab — it takes your own inputs and returns a figure specific to your setup, which is always more accurate than a published range.

Model your own numbers

Related reading

More answers in this category

Looking for a calculator?

Search every free tool on RevenueLab — or describe your problem and Rex will pick one.

Last updated 2026-10-01.