Ductless Mini-Split Install Cost Calculator

Build a ductless mini-split install price from real material, crew and overhead cost — not from guesswork.

Revenue Rex peeking

Rex says

Money math without the spreadsheet headache. Plug in your numbers and I'll show you exactly where the dollars land.

Try a scenario

Click to load — tweak from there.

Inputs

Result

Quote this job at

$6,895

Price per head

$2,298.24

Your total cost

$5,387

Gross profit

$1,508

Gross margin

21.9%

Material (incl. waste)

$3,554

Labour cost

$1,833

Crew hours

19.5

Crew days (8h)

2.4

Break-even per head

$1,795.50

Revenue Rex peeking

Psst — share this and help Rex grow

One click, a permanent link with your numbers baked in.

More financial

Got your number — what next?

Pick one, it takes 20 seconds

How to use this

  1. 1Enter job size (indoor heads) (head).
  2. 2Enter material cost per head ($).
  3. 3Enter waste / overage (%).
  4. 4Enter crew hours per head (hrs).
  5. 5Enter burdened crew rate ($/hr).
  6. 6Enter overhead allocated to this job ($).
  7. 7Enter markup on total cost (%).
  8. 8Read your quote this job at on the right — it updates as you type.
  9. 9Hit Share to keep the scenario or send it to someone.

About this calculator

Ductless Mini-Split Install is priced per indoor head, and the number that actually decides whether the job is profitable is the fully-loaded cost per head — material plus waste, plus crew hours at your real burdened labour rate, plus the overhead every job has to carry. This calculator builds that number from the ground up rather than reverse-engineering it from a competitor's price. At the defaults here, material runs about $1150.00 per head and labour runs roughly 6.5 crew-hours per head, which at a $94/hr burdened crew rate is about $611.00 per head in labour alone. Line-set routing and condensate drainage decide the install time, not the head count on the proposal. Mini-split installs run $3,000–$6,000 for a typical two-head system. Change the crew rate to your real burdened cost — wages plus payroll tax, workers' comp, vehicle, insurance and non-billable time — because using a bare wage rate is the single most common reason a busy ductless mini-split install business still ends the year with no profit. The markup field is a markup on total cost, not a margin: a 35% markup on cost is a 25.9% gross margin, and confusing the two is worth thousands a year on a full schedule.

FormulaPrice = ((Material x Units x (1 + Waste%)) + (Crew hours x Units x Burdened rate) + Overhead) x (1 + Markup%)

Worked example

Using the values the calculator loads with:

Inputs

  • Job size (indoor heads): 3 head
  • Material cost per head: 1150 $
  • Waste / overage: 3 %
  • Crew hours per head: 6.5 hrs
  • Burdened crew rate: 94 $/hr
  • Overhead allocated to this job: 0 $
  • Markup on total cost: 28 %

Results

  • Quote this job at: $6,895
  • Price per head: $2,298.24
  • Your total cost: $5,387
  • Gross profit: $1,508
  • Gross margin: 21.9%
  • Material (incl. waste): $3,554
  • Labour cost: $1,833
  • Crew hours: 19.5
  • Crew days (8h): 2.4
  • Break-even per head: $1,795.50

What each field means

Inputs

Job size (indoor heads) (head)
The job size (indoor heads) used in the calculation, measured in head. Starts at 3 head so you have a working example on load.
Material cost per head ($)
The material cost per head used in the calculation, measured in $. Starts at 1150 $ so you have a working example on load.
Waste / overage (%)
The waste / overage used in the calculation, measured in %. Starts at 3 % so you have a working example on load. Accepted range: 0–60 %.
Crew hours per head (hrs)
The crew hours per head used in the calculation, measured in hrs. Starts at 6.5 hrs so you have a working example on load.
Burdened crew rate ($/hr)
The burdened crew rate used in the calculation, measured in $/hr. Starts at 94 $/hr so you have a working example on load.
Overhead allocated to this job ($)
The overhead allocated to this job used in the calculation, measured in $. Starts at 0 $ so you have a working example on load.
Markup on total cost (%)
The markup on total cost used in the calculation, measured in %. Starts at 28 % so you have a working example on load. Accepted range: 0–200 %.

Results

Quote this job at
Returned as a money amount in US dollars and shown as the headline result. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Price per head
Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Your total cost
Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Gross profit
Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Gross margin
Returned as a percentage. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Material (incl. waste)
Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Labour cost
Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Crew hours
Returned as a decimal number. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Crew days (8h)
Returned as a decimal number. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Break-even per head
Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.

FAQ

How much should I charge per head for ductless mini-split install?

Work from cost, not from the market. Mini-split installs run $3,000–$6,000 for a typical two-head system. Take your material cost per head, add your waste factor, add crew hours times your burdened hourly cost, add your overhead allocation, then apply your markup. If that number lands well above local pricing, the problem is usually productivity or overhead, not greed.

What is a burdened labour rate and why does it matter here?

Burdened rate is what an hour of crew time truly costs you: wages, payroll taxes, workers' compensation, vehicle and fuel, tools, insurance, and the unbillable hours between jobs. It is commonly 1.4x to 1.8x the bare wage. Quoting off bare wages is the fastest way to run a busy, unprofitable business.

Is markup the same as profit margin?

No, and the gap is bigger than people expect. Markup is added to cost; margin is a share of the price. A 35% markup gives a 25.9% margin, and a 50% markup gives a 33.3% margin. If you need a 40% margin you must mark up by 66.7%.

How should I handle the waste factor on ductless mini-split install?

The default here is 3%, which is a reasonable starting point for straightforward work. Complex layouts, cuts, patterns and awkward access all push it higher. Track your actual waste for a few jobs and replace the default with your own number — it is one of the easiest measurable wins in estimating.

Should overhead be a percentage or a fixed amount per job?

Both work if you are consistent. Percentage-of-cost is simpler and self-scaling; a fixed per-day allocation is more accurate when your jobs vary wildly in size. What fails is having no overhead line at all and hoping the markup covers it.

Accuracy and limitations

  • Results are estimates before tax, fees, and inflation unless an input explicitly covers them.
  • Rates are treated as fixed for the whole period — variable-rate products will drift from this projection.
  • This is educational maths, not financial advice. Check anything contractual with the lender or your accountant.

Cite this calculator

Writing about this topic? Grab a citation — every link helps keep these tools free.

APA
RevenueLab. (2026). Ductless Mini-Split Install Cost Calculator (2026 Pricing). Retrieved from https://www.revenuelab.fyi/toolbox/mini-split-install-cost-calculator
HTML
<p>Source: <a href="https://www.revenuelab.fyi/toolbox/mini-split-install-cost-calculator" target="_blank" rel="noopener">Ductless Mini-Split Install Cost Calculator (2026 Pricing) — RevenueLab</a> (2026).</p>
Markdown
Source: [Ductless Mini-Split Install Cost Calculator (2026 Pricing) — RevenueLab](https://www.revenuelab.fyi/toolbox/mini-split-install-cost-calculator) (2026).
Advertisement