
Rex says
Money math without the spreadsheet headache. Plug in your numbers and I'll show you exactly where the dollars land.
Try a scenario
Click to load — tweak from there.Inputs
Result
Quote this job at
$1,365
Price per install
$1,364.61
Your total cost
$1,066
Gross profit
$299
Gross margin
21.9%
Material (incl. waste)
$639
Labour cost
$428
Crew hours
4.5
Crew days (8h)
0.6
Break-even per install
$1,066.10

Psst — share this and help Rex grow
One click, a permanent link with your numbers baked in.
Got your number — what next?
Pick one, it takes 20 secondsHow to use this
- 1Enter job size (installations) (install).
- 2Enter material cost per install ($).
- 3Enter waste / overage (%).
- 4Enter crew hours per install (hrs).
- 5Enter burdened crew rate ($/hr).
- 6Enter overhead allocated to this job ($).
- 7Enter markup on total cost (%).
- 8Read your quote this job at on the right — it updates as you type.
- 9Hit Share to keep the scenario or send it to someone.
About this calculator
EV Charger Installation is priced per installation, and the number that actually decides whether the job is profitable is the fully-loaded cost per install — material plus waste, plus crew hours at your real burdened labour rate, plus the overhead every job has to carry. This calculator builds that number from the ground up rather than reverse-engineering it from a competitor's price. At the defaults here, material runs about $620.00 per install and labour runs roughly 4.5 crew-hours per install, which at a $95/hr burdened crew rate is about $427.50 per install in labour alone. Run length from the panel to the garage wall is the single biggest cost variable and must be measured, not assumed. Level 2 home charger installs commonly run $800–$2,500 including the unit. Change the crew rate to your real burdened cost — wages plus payroll tax, workers' comp, vehicle, insurance and non-billable time — because using a bare wage rate is the single most common reason a busy ev charger installation business still ends the year with no profit. The markup field is a markup on total cost, not a margin: a 35% markup on cost is a 25.9% gross margin, and confusing the two is worth thousands a year on a full schedule.
Worked example
Using the values the calculator loads with:
Inputs
- Job size (installations): 1 install
- Material cost per install: 620 $
- Waste / overage: 3 %
- Crew hours per install: 4.5 hrs
- Burdened crew rate: 95 $/hr
- Overhead allocated to this job: 0 $
- Markup on total cost: 28 %
Results
- Quote this job at: $1,365
- Price per install: $1,364.61
- Your total cost: $1,066
- Gross profit: $299
- Gross margin: 21.9%
- Material (incl. waste): $639
- Labour cost: $428
- Crew hours: 4.5
- Crew days (8h): 0.6
- Break-even per install: $1,066.10
What each field means
Inputs
- Job size (installations) (install)
- The job size (installations) used in the calculation, measured in install. Starts at 1 install so you have a working example on load.
- Material cost per install ($)
- The material cost per install used in the calculation, measured in $. Starts at 620 $ so you have a working example on load.
- Waste / overage (%)
- The waste / overage used in the calculation, measured in %. Starts at 3 % so you have a working example on load. Accepted range: 0–60 %.
- Crew hours per install (hrs)
- The crew hours per install used in the calculation, measured in hrs. Starts at 4.5 hrs so you have a working example on load.
- Burdened crew rate ($/hr)
- The burdened crew rate used in the calculation, measured in $/hr. Starts at 95 $/hr so you have a working example on load.
- Overhead allocated to this job ($)
- The overhead allocated to this job used in the calculation, measured in $. Starts at 0 $ so you have a working example on load.
- Markup on total cost (%)
- The markup on total cost used in the calculation, measured in %. Starts at 28 % so you have a working example on load. Accepted range: 0–200 %.
Results
- Quote this job at
- Returned as a money amount in US dollars and shown as the headline result. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
- Price per install
- Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
- Your total cost
- Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
- Gross profit
- Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
- Gross margin
- Returned as a percentage. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
- Material (incl. waste)
- Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
- Labour cost
- Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
- Crew hours
- Returned as a decimal number. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
- Crew days (8h)
- Returned as a decimal number. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
- Break-even per install
- Returned as a money amount in US dollars. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
FAQ
How much should I charge per install for ev charger installation?
Work from cost, not from the market. Level 2 home charger installs commonly run $800–$2,500 including the unit. Take your material cost per install, add your waste factor, add crew hours times your burdened hourly cost, add your overhead allocation, then apply your markup. If that number lands well above local pricing, the problem is usually productivity or overhead, not greed.
What is a burdened labour rate and why does it matter here?
Burdened rate is what an hour of crew time truly costs you: wages, payroll taxes, workers' compensation, vehicle and fuel, tools, insurance, and the unbillable hours between jobs. It is commonly 1.4x to 1.8x the bare wage. Quoting off bare wages is the fastest way to run a busy, unprofitable business.
Is markup the same as profit margin?
No, and the gap is bigger than people expect. Markup is added to cost; margin is a share of the price. A 35% markup gives a 25.9% margin, and a 50% markup gives a 33.3% margin. If you need a 40% margin you must mark up by 66.7%.
How should I handle the waste factor on ev charger installation?
The default here is 3%, which is a reasonable starting point for straightforward work. Complex layouts, cuts, patterns and awkward access all push it higher. Track your actual waste for a few jobs and replace the default with your own number — it is one of the easiest measurable wins in estimating.
Should overhead be a percentage or a fixed amount per job?
Both work if you are consistent. Percentage-of-cost is simpler and self-scaling; a fixed per-day allocation is more accurate when your jobs vary wildly in size. What fails is having no overhead line at all and hoping the markup covers it.
Accuracy and limitations
- Results are estimates before tax, fees, and inflation unless an input explicitly covers them.
- Rates are treated as fixed for the whole period — variable-rate products will drift from this projection.
- This is educational maths, not financial advice. Check anything contractual with the lender or your accountant.
Cite this calculator
Writing about this topic? Grab a citation — every link helps keep these tools free.
RevenueLab. (2026). EV Charger Installation Cost Calculator (2026 Pricing). Retrieved from https://www.revenuelab.fyi/toolbox/ev-charger-install-cost-calculator
<p>Source: <a href="https://www.revenuelab.fyi/toolbox/ev-charger-install-cost-calculator" target="_blank" rel="noopener">EV Charger Installation Cost Calculator (2026 Pricing) — RevenueLab</a> (2026).</p>
Source: [EV Charger Installation Cost Calculator (2026 Pricing) — RevenueLab](https://www.revenuelab.fyi/toolbox/ev-charger-install-cost-calculator) (2026).
