Concrete Cubic Yards Calculator

Convert a slab, footing, or pad's dimensions straight into cubic yards of ready-mix.

Revenue Rex peeking

Rex says

Everyday utility math — the kind you'd otherwise pull up four browser tabs for. I keep it to one clean answer.

Try a scenario

Click to load — tweak from there.

Inputs

Result

Concrete needed (with waste)

2.72

Total cubic feet

66.7

Raw volume (no waste)

2.47

Equivalent in 80lb bags

122

Revenue Rex peeking

Psst — share this and help Rex grow

One click, a permanent link with your numbers baked in.

More other

How to use this

  1. 1Enter length (ft).
  2. 2Enter width (ft).
  3. 3Enter thickness (in).
  4. 4Enter waste factor (%).
  5. 5Read your concrete needed (with waste) on the right — it updates as you type.
  6. 6Hit Share to keep the scenario or send it to someone.

About this calculator

Ready-mix concrete is sold and delivered by the cubic yard, so before you call a batch plant or a pump truck you need your pour's volume converted out of feet and inches. This calculator takes length, width, and thickness in feet (thickness entered in inches is converted automatically) and multiplies them to get cubic feet, then divides by 27 because one cubic yard equals 27 cubic feet. It also applies a waste factor, typically 5-10%, to cover subgrade irregularities, form leakage, and the reality that a slab is rarely a perfectly flat rectangle at exactly the thickness on the plan. Most ready-mix suppliers have a minimum load, often 1 cubic yard or a short-load fee below 3-4 yards, so knowing your real number before you call avoids both under-ordering (a cold joint mid-pour is a real defect) and over-ordering, which wastes money on a product you can't return. This is the same math used behind footings, patios, sidewalks, and driveway pours, just with different waste factors depending on how forgiving the subgrade prep was.

FormulaCubic Yards = (Length ft × Width ft × Thickness ft) ÷ 27, then × (1 + Waste%). Thickness ft = Thickness in ÷ 12.

Worked example

Using the values the calculator loads with:

Inputs

  • Length: 20 ft
  • Width: 10 ft
  • Thickness: 4 in
  • Waste factor: 10 %

Results

  • Concrete needed (with waste): 2.72
  • Total cubic feet: 66.7
  • Raw volume (no waste): 2.47
  • Equivalent in 80lb bags: 122

What each field means

Inputs

Length (ft)
The length used in the calculation, measured in ft. Starts at 20 ft so you have a working example on load.
Width (ft)
The width used in the calculation, measured in ft. Starts at 10 ft so you have a working example on load.
Thickness (in)
The thickness used in the calculation, measured in in. Starts at 4 in so you have a working example on load. Accepted range: 1–24 in.
Waste factor (%)
The waste factor used in the calculation, measured in %. Starts at 10 % so you have a working example on load. Accepted range: 0–30 %.

Results

Concrete needed (with waste)
Returned as a decimal number and shown as the headline result. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Total cubic feet
Returned as a decimal number. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Raw volume (no waste)
Returned as a decimal number. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.
Equivalent in 80lb bags
Returned as a whole number. It recalculates instantly whenever you change an input, so you can compare scenarios without reloading.

FAQ

Why divide by 27?

One cubic yard is 3 feet × 3 feet × 3 feet, which equals 27 cubic feet. Ready-mix trucks and batch plants price and measure in cubic yards, so every slab or footing calculation eventually needs that conversion.

How much waste factor should I use?

5% for a well-formed, flat, prepped slab; 10% is the safe default for most DIY pours; 15%+ for irregular ground, thick footings, or if you're new to finishing concrete and expect some spillage or overpour at the edges.

What if my slab thickness varies across the pour?

Use the thickest section for safety, or better, average several measurement points across the form since ready-mix trucks won't make a second trip for a shortfall without a hefty short-load fee.

Is it cheaper to order ready-mix or mix bags for this volume?

Above roughly 1-1.5 cubic yards, ready-mix delivered is almost always cheaper per yard and far less labor than mixing 45-70 bags by hand or with a rented mixer.

Accuracy and limitations

  • Estimates assume standard, average conditions — local rules, pricing, and materials vary.
  • Results are rounded for readability; add a buffer before ordering, booking, or committing.
  • Double-check anything with a real cost attached against a local quote.

Related tools

Cite this calculator

Writing about this topic? Grab a citation — every link helps keep these tools free.

APA
RevenueLab. (2026). Concrete Cubic Yards Calculator. Retrieved from https://www.revenuelab.fyi/toolbox/concrete-cubic-yards-calculator
HTML
<p>Source: <a href="https://www.revenuelab.fyi/toolbox/concrete-cubic-yards-calculator" target="_blank" rel="noopener">Concrete Cubic Yards Calculator — RevenueLab</a> (2026).</p>
Markdown
Source: [Concrete Cubic Yards Calculator — RevenueLab](https://www.revenuelab.fyi/toolbox/concrete-cubic-yards-calculator) (2026).