2Cubic yards needed

Right in ready-mix territory. Confirm the plant's minimum load and short-load fee before ordering.

How it's calculated: Order 2.75 yd³ with 10% waste — about $468 of ready-mix Adjust the inputs below to recalculate for your own numbers.

New here? Watch it work in 2 seconds — then tweak it for you.
20
10
4

4 in patios, 5–6 in driveways, 6 in garage floors.

$170
Try it like this

Tap a scenario to load realistic numbers, then tweak the sliders.

Formula used

The yardage formula

One cubic yard is 27 cubic feet. The classic mistake is forgetting to convert thickness from inches to feet — 4 inches is 0.333 ft, not 4 ft. Add 10% for subgrade unevenness and spillage.

yards = length (ft) × width (ft) × thickness (in) ÷ 12 ÷ 27
1 cubic yard
27 ft³
2026 ready-mix average
$150–190/yd³
Use this elsewhere

Embed or cite it

Backlink-friendly embed

Embed this calculator

Free to embed on any site. Inputs preserved, link back to RevenueLab. Each format trades polish for SEO juice.

<script async src="https://www.revenuelab.fyi/embed.js"
  data-calculator="concrete-yardage-calculator"
  data-title="Concrete Yardage Calculator"
  data-query="length=20&width=10&thickness=4&pricePerYard=170"></script>

Recommended — auto-resizes to fit, no scrollbars, and drops a crawlable link in your page.

Cite this calculator

Writing about this topic? Grab a citation — every link helps keep these tools free.

APA
RevenueLab. (2026). Concrete Yardage Calculator. Retrieved from https://www.revenuelab.fyi/concrete-yardage-calculator
HTML
<p>Source: <a href="https://www.revenuelab.fyi/concrete-yardage-calculator" target="_blank" rel="noopener">Concrete Yardage Calculator — RevenueLab</a> (2026).</p>
Markdown
Source: [Concrete Yardage Calculator — RevenueLab](https://www.revenuelab.fyi/concrete-yardage-calculator) (2026).

Bags or truck?

The crossover is roughly 1–1.5 yards. Below that, 80-lb bags at $6–8 each beat the ready-mix short-load fee; above it, delivered concrete wins on price and saves a day of mixing. A yard of bagged concrete runs $270–360 versus $150–190 delivered.

Thickness is the decision that matters

Four inches for patios and walkways, five to six for driveways, six for garage floors and anything bearing vehicles. Skimping on thickness to save half a yard is the most expensive mistake in residential flatwork — the re-pour costs ten times the savings.

FAQ

How many cubic feet are in a yard of concrete?

27. Divide your volume in cubic feet by 27 to get cubic yards.

How much extra should I order?

10% is the standard allowance for uneven subgrade, spillage, and form bowing. Running short mid-pour means a cold joint or an emergency second delivery — both worse than a quarter-yard left over.

How this calculator is built

Independently maintained

Written by Sam Doshi and the RevenueLab editorial team. We don't sell the data feeds this tool is built on.

Sourced from primary data

Benchmarks come from public AdSense / Stripe / IRS disclosures and reader-submitted data — never third-party "$X per view" claims. Full methodology.

Last editorial review

Reviewed on a rolling quarterly cycle. Dated reviews are published on the methodology record for each calculator.

Editorial standards

See our editorial policy and disclaimer. Results are estimates, not advice.

Helpful?
Psst — we're giving away a limited-edition Rex plush. Free to enter, no purchase needed.